@@ -8,6 +8,7 @@ This is the working delivery tracker for GuestOps Web. Update a milestone when i
|
||||
## Status key
|
||||
|
||||
- **Implemented** — present on `main` and supported by code or automated-test evidence.
|
||||
- **In progress** — repository or environment work has started but an exit condition remains open.
|
||||
- **Acceptance required** — implemented in code but still requires a real provider, Debian host, or operational exercise.
|
||||
- **Planned** — work is not yet complete.
|
||||
- **Deferred** — intentionally outside the current release gate.
|
||||
@@ -33,7 +34,7 @@ This is the working delivery tracker for GuestOps Web. Update a milestone when i
|
||||
| 7 | Google connection recovery | B | Implemented / acceptance required | Connection epochs, checkpoint recovery, and revocation handling are promoted to local `main`; complete real Google acceptance and worker-restart exercises. |
|
||||
| 8 | Operational readiness tooling | A | Implemented / acceptance required | Backup, restore, release, and diagnostic tooling is promoted to local `main`; execute it on the actual Debian host and retain evidence. |
|
||||
| 9 | Gitea and reproducible releases | A | In progress | The reviewed candidate is promoted in the local `main` history. CI now records the full commit, matched application version, archive checksum and immutable image IDs, and the rollback procedure is documented. Push the merge, retain the successful release evidence off-host, and create a new immutable approval tag; the existing `0.1.0` tag remains attached to the original foundation release. |
|
||||
| 10 | Debian deployment and persistence | A | Planned | Provision the target host, HTTPS and reverse proxy; persist MongoDB, data-protection keys, logs, and configuration; then verify restart and upgrade behaviour. |
|
||||
| 10 | Debian deployment and persistence | A | In progress | Compose uses separate named database and shared key volumes, private host configuration, loopback-only API access and bounded logs. The confirmation-gated persistence drill verifies restart and container-recreation behaviour. Run it on the provisioned Debian host, complete HTTPS and controlled-reboot acceptance, and retain the evidence. |
|
||||
| 11 | Backups, monitoring, and recovery | A | Planned | Schedule backups, define alerts and ownership, prove off-host retention, and perform a timed restore and recovery drill. |
|
||||
| 12 | Google mailbox and reviewed-reply acceptance | B | Planned | Complete OAuth verification, import/send acceptance, reconnect/revocation tests, identity-change handling, and duplicate/uncertain-send drills with a sandbox mailbox. |
|
||||
| 13 | Rezlynx/Guestline adapter | C | Planned | Obtain the provider contract and sandbox, implement the adapter and mapping, and accept idempotency, stale-data, ambiguous-write, and reconciliation paths. |
|
||||
|
||||