Integrate Gate B acceptance bundle

This commit is contained in:
2026-10-01 15:40:28 +01:00
parent 158d21ca04
commit c5c6ec1453
4 changed files with 393 additions and 6 deletions
+6 -6
View File
@@ -22,13 +22,13 @@ This summary explains what each milestone delivers and where it currently stands
| 9 | Gitea and reproducible releases | A checksummed source package, Ansible-controlled installation, recorded image identities, retained artifacts, and approval tagging. | **In progress.** The runner-free deterministic packager is implemented and the Gitea Action is removed; the release-line identity must be confirmed, then the package, Ansible installation evidence, and approval record must be retained. |
| 10 | Debian deployment and persistence | Secure Debian/Compose deployment, HTTPS, persistent database and key volumes, and reboot/recreation proof. | **In progress.** The verified Ansible handoff now covers commit-bound installation, boot services, Nginx validation, listener restrictions and public HTTPS; privileged installation, firewall review, controlled reboot and supervised persistence evidence remain open. |
| 11 | Backups, monitoring, and recovery | Scheduled encrypted backups, verified off-host transfer, Zabbix monitoring, restore, and rollback rehearsal. | **In progress.** The Ansible operations handoff now installs validated systemd units, public-key-only backup support, transfer retry and restricted Zabbix status; secret provisioning, durable-log confirmation, manual backup, timed restore, rollback and independent evidence remain open. |
| 12 | Google mailbox acceptance | End-to-end Gmail consent, import, recovery, reviewed sending, reconciliation, and revocation evidence. | **In progress.** The runbook and validator exist; the live synthetic-data exercise and independent review remain outstanding. |
| 12 | Google mailbox acceptance | End-to-end Gmail consent, import, recovery, reviewed sending, reconciliation, and revocation evidence. | **In progress.** The runbook, record validator and release-bound Gate B bundle integration exist; the live synthetic-data exercise and independent review remain outstanding. |
| 13 | Rezlynx/Guestline adapter | The real PMS provider adapter, mappings, idempotency, reconciliation, and ambiguous-write handling. | **Planned.** Provider contract and sandbox access are still required before implementation and acceptance. |
| 14 | Payment links and status | The real payment-provider integration, webhooks, expiry, replay protection, and reconciliation. | **Planned.** The provider path and sandbox acceptance plan still need to be confirmed and completed. |
| 15 | Knowledge, AI, and FAQ activation | Supervised knowledge-quality, AI-draft, FAQ test-mode, staff-training, and stop-control acceptance. | **Implemented; acceptance required.** The evaluation tooling exists; the supervised evaluation and independent approval remain outstanding. |
| 15 | Knowledge, AI, and FAQ activation | Supervised knowledge-quality, AI-draft, FAQ test-mode, staff-training, and stop-control acceptance. | **Implemented; acceptance required.** Evaluation tooling and cross-release bundle validation exist; the supervised evaluation, staff training and independent approval remain outstanding. |
| 16 | Identity, preferences, and privacy | Account/session controls, hotel preferences, privacy inventory, retention decisions, and audit review. | **Implemented; acceptance required.** Legal and operational decisions, identity checks, and independent review remain outstanding. |
| 17 | Inbox usability and desktop parity | Stable pagination, protected unsaved drafts, hotel-timezone display, and desktop workflow parity. | **Implemented; acceptance required.** Automated checks pass; the supervised desktop exercise and independent approval remain outstanding. |
| 18 | Pilot, capacity, and release approval | Capacity proof, incident exercise, five-business-day hotel pilot, findings closure, and Gate B approval. | **In progress.** Validators and targets exist; Gate A/B prerequisites, capacity evidence, incident rehearsal, pilot, and named approvals remain open. |
| 18 | Pilot, capacity, and release approval | Capacity proof, incident exercise, five-business-day hotel pilot, findings closure, and Gate B approval. | **In progress.** The integrated bundle validator now enforces one archive, release record, image set, environment, capacity report, pilot record and approval decision; live prerequisites, incident rehearsal, five-day pilot and named approvals remain open. |
| 19 | Account security and self-service | TOTP MFA, recovery codes, transactional email, granular roles, preferences, and security notifications. | **Implemented on the development branch; acceptance required.** Keep it separate until `0.2.1` is approved and tagged, then review, merge, and version it as `0.3.0`. |
## Status key
@@ -62,13 +62,13 @@ This summary explains what each milestone delivers and where it currently stands
| 9 | Gitea and reproducible releases | A | In progress | `deploy/package_source.py` now packages only an explicit committed ref, verifies matched application versions, produces deterministic gzip output and a SHA-256 source record, and refuses overwrite. Hand that package to a version-selected Ansible playbook following the CMS/CMSFront pattern. Ansible must verify and install it, build commit-tagged images, record their immutable IDs, and deploy without a Gitea runner. Retain the package/install evidence off-host and resolve the release-line/tag identity before approval; the existing `0.1.0` tag remains attached to the foundation release. |
| 10 | Debian deployment and persistence | A | In progress | Compose uses separate named database and shared key volumes, private host configuration, loopback-only API access and bounded logs. The Ansible handoff verifies the source on both controller and host, enables Docker/Nginx at boot, installs and validates the reviewed proxy, rejects exposed API/MongoDB listeners, and requires trusted public HTTPS before selecting the release. Run it on the provisioned Debian host, review the firewall, complete the confirmation-gated persistence drill and controlled reboot, and retain independent evidence. |
| 11 | Backups, monitoring, and recovery | A | In progress | Encrypted backup and isolated restore tooling includes opt-in systemd scheduling, checksum-verified rsync transfer, restricted Zabbix status, guarded local retention and a release-bound acceptance validator. The Ansible operations playbook now verifies the selected release and private-file modes, imports only the recovery public key, validates and installs the units, enables transfer/monitoring, leaves backup scheduling off until manual acceptance, and fetches non-sensitive evidence. Provision secrets and durable logs, configure central alerts/retention, run the manual backup plus timed restore and rollback drills, and retain independent approval. |
| 12 | Google mailbox and reviewed-reply acceptance | B | In progress | The synthetic-data provider runbook, exact scenario set and restricted-record validator are implemented. Complete every scenario against the accepted Debian release and dedicated Google sandbox accounts, independently review the evidence, and retain the validated record. |
| 12 | Google mailbox and reviewed-reply acceptance | B | In progress | The synthetic-data provider runbook, exact scenario set and restricted-record validator are implemented and wired into the Gate B bundle validator. Complete every scenario against the accepted Debian release and dedicated Google sandbox accounts, independently review the evidence, and retain the validated record. |
| 13 | Rezlynx/Guestline adapter | C | Planned | Obtain the provider contract and sandbox, implement the adapter and mapping, and accept idempotency, stale-data, ambiguous-write, and reconciliation paths. |
| 14 | Payment links and status | C | Planned | Select/confirm the payment-provider path, complete sandbox and webhook acceptance, and prove expiry, replay protection, reconciliation, and support recovery. |
| 15 | Knowledge, AI, and FAQ activation | B | Implemented / acceptance required | Owners can run a bounded no-send batch evaluation, and a release-bound acceptance record enforces positive/negative coverage, zero FAQ errors, separate AI review, staff training, stop-control evidence and named monitoring/rollback owners. Complete the supervised evaluation and retain independent approval. |
| 15 | Knowledge, AI, and FAQ activation | B | Implemented / acceptance required | Owners can run a bounded no-send batch evaluation, and a release-bound acceptance record enforces positive/negative coverage, zero FAQ errors, separate AI review, staff training, stop-control evidence and named monitoring/rollback owners. The integrated Gate B bundle rejects release or environment mismatches. Complete the supervised evaluation and retain independent approval. |
| 16 | Identity, preferences, and privacy | B/C | Implemented / acceptance required | Login throttling trusts the client address only after one-hop processing by the configured proxy. A release-bound review now covers owner-controlled preferences, account/session controls, data inventory, retention/deletion/legal-hold ownership, provider decisions, audit evidence and known identity limitations. Complete the legal/operational decisions and independently approve the record. |
| 17 | Inbox usability and desktop parity | B | Implemented / acceptance required | The inbox uses tenant-scoped stable cursor pagination in pages of 50 and protects unsaved drafts during route/history navigation, reload, conversation selection, filtering and search. Operational timestamps use the saved hotel timezone, and a release-bound desktop-parity acceptance record is implemented. The implementation and preview HTTP suite pass; run the supervised exercise against the approved release and retain independent approval. |
| 18 | Pilot, capacity, and release approval | B/C | In progress | The `0.2.1` Gate B candidate has bounded capacity, five-business-day pilot, incident and final-decision record validators with agreed targets. Retain the exact source-package and Ansible-install evidence, complete Gate A and Gate B prerequisites, run the probe and supervised exercises, resolve or contain findings, and retain separate hotel-owner and technical approval. Gate C remains dependent on milestones 13 and 14. |
| 18 | Pilot, capacity, and release approval | B/C | In progress | The `0.2.1` Gate B candidate has bounded capacity, five-business-day pilot, incident and final-decision validators plus an integrated bundle check that binds every prerequisite to one release and verifies the retained capacity/pilot checksums. Retain the exact package and Ansible evidence, complete the live Gate A/B exercises, resolve or contain findings, and retain separate hotel-owner and technical approval. Gate C remains dependent on milestones 13 and 14. |
## Delivery sequence